Industry and infrastructures

MAJOR ENGINEERING WORKS:  INDUSTRY, INFRASTRUCTURES AND MINING

More than 195 works in Spain, Portugal, Italy, Morocco, Honduras and Algeria. Among the most important ones are:

· High speed train tunnels in Guadarrama, Spain. Length 2 x 28 km: fire extinction system design.

· Distribution center for Logista at Leganés (Madrid), warehouse area 23.000 m²,  office 4.000 m²: electrical / lighting, emergency power generation and IT cabling projects.

· Distribution center for Riofisa at San Agustín de Guadalix (Madrid), warehouse area 15.000 m²,  office 400 m²: projects of electrical / lighting, IT cabling, fire protection, HVAC and plumbing systems design.

· Distribution center for Cecauto at San Boi del Vallés (Barcelona), warehouse area 5.000 m²,  office 1.700 m²: electrical / lighting, IT cabling, fire protection, HVAC and plumbing systems design.

· Industrial area (200.000 m²) for Redur at Algete (Madrid): fire protection system design; electrical infrastructure for the first phase.

· Distribution center (22.900 m²) and office (800 m²) for Redur at Algete (Madrid): fire protection system design.

· Industrial building for DAF at Algete (Madrid), 6.100 m²: electrical / lighting, IT cabling, fire protection, HVAC and plumbing systems design.

· Distribution center at Getafe (Madrid), warehouse area 5.200 m²,  office 1.200 m²: electrical system design.

· Distribution center at Martorelles (Barcelona), warehouse area 24.500 m²,  office 3.200 m²: electrical system design.

· El Viso residential area, Argés (Toledo), 117.000 m²: project for new street lighting.

· Transport interchange hub at Plaza Elíptica, Madrid, 23.000 m²: HVAC project review.

· Advice for the redaction of the mandatory technical requirements for HVAC systems of transport facilities owned by the Consorcio de Transportes de Madrid.

· Crushing, conveying and sizing mining machinery design for Trame and Canteras El Sierro.

· White marble micronizer plant at Macael (Almería), capacity 100.000 Tm/year: preliminary design.

· Leather curing facility at Huecas (Toledo), area 750 m²: industrial building and services project.

· Sludge drying plant in 775.000 m³/day flow waste water treatment plant at Milan (Italy): collaboration in design.

· Process water recycling plant for gravel pit at Peñas de San Pedro (Albacete), flow 50 m³/h: design.

· Containers sea port at Puerto Cortés (Honduras): review of the port services project; preparation of the technical offer for its construction

Other works:

· Sea water desalination plant at Adeje and Arona (Tenerife), flow 10.000 m³/day: assembling and installations project management. Done in SPA (FCC group).

· Oily waste water treatment plant in the Candelaria fuel power plant (Tenerife, Spain): project management and commissioning. Done in SPA (FCC group).

· Valdecañas hydroelectric power plant, 225 MW: maintenance works. Done in NIP.

· Cofrentes nuclear power plant: maintenance and project improvements implementation. Done in NIP.